首页> 外文会议>SPE/IADC drilling conference >Planning and Execution of a Long, Tight Clearance Liner Through a WhipstockMilled Window
【24h】

Planning and Execution of a Long, Tight Clearance Liner Through a WhipstockMilled Window

机译:通过WhipstockMilled窗口规划和执行一个长而紧的间隙衬套

获取原文

摘要

A long, tight clearance liner was recently installed through awhipstock-milled window in a deepwater well. The lengthand weight of the liner, coupled with the tight clearances,pushed the limits of current technology. The liner wassuccessfully run through a deep whipstock milled window andcemented at a depth below 24,000'. This paper describes theplanning and execution involved in this critical wellconstruction operation.
机译:最近通过一个 造斜器在深水井中打磨的窗口。长度 衬套的重量和重量,再加上紧密的间隙, 突破了当前技术的极限。班轮是 成功地通过了一个深的造斜磨碎的窗口,并且 胶结在24,000'以下的深度。本文介绍了 关键井的计划和执行 施工作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号