Precast Segmental Technology and the Woodrow Wilson Bridge: Design and Construction of the Fixed Span Piers

机译:预制分段技术与伍德罗·威尔逊大桥:固定跨度墩的设计与施工

获取原文

摘要

Precast segmental concrete V-piers comprise the chief fixed span substructure components of the new Woodrow Wilson Bridge. Large precast segments, construction over water, and complex pier geometry have encouraged both Maryland and Virginia approach contractors to developed creative precasting and erection methods. Examples include the use of temporary stays during cantilevered construction, barge mounted cranes to place 155 metric ton (170 U.S. tons) precast segments, and "long-line" casting beds with curved soffit and side forms.
机译:预制分段混凝土V型墩是新伍德罗·威尔逊大桥的主要固定跨度子结构部件。大型预制段,水上施工以及复杂的墩台几何形状都鼓励马里兰州和弗吉尼亚州的方法承包商开发创新的预制和安装方法。例子包括在悬臂施工过程中使用临时支柱,安装在驳船上的起重机来放置155公吨(170美吨)预制段以及带有弧形拱腹和侧面模板的“长线”铸造床。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号