WINDSCALE PILE 1 - A NEW APPROACH

机译:风标桩1-一种新方法

获取原文

摘要

One of the most technically challenging reactor decommissioning projects in the UK, if not the world, is being tackled in a new way managed by a team lead by the United Kingdom Atomic Energy Authority. Windscale Pile 1, a graphite moderated, air cooled, horizontal, natural uranium fuelled reactor was damaged by fire in October 1957. De-fuelling, initial clean-up and isolation operations were carried out in the 1960's. During the 1980's and 90's a successful Phase 1 decommissioning campaign resulted in the plant being cleared of all accessible fuel and graphite debris and it being sealed and isolated from associated facilities and put on a monitoring and surveillance regime while plans for dismantling were being developed. For years intrusive inspection of the fire damaged region has been precluded on safety grounds. Consequently early plans for dismantling were constructed using pessimistic assumptions and worst case predictions. This in turn lead to technical, financial and regulatory hurdles which were found to be too high to overcome.
机译:由英国原子能管理局牵头的小组以一种新的方式来解决英国乃至世界上最具技术挑战性的反应堆退役项目之一。 1957年10月,风鳞桩1(石墨缓和,空冷,水平,天然铀燃料反应堆)被大火烧毁。加油,初步清理和隔离操作在1960年代进行。在1980年代和90年代,成功的第一阶段退役运动导致该工厂清除了所有可及的燃料和石墨碎屑,并将其密封并与相关设施隔离,并在制定拆除计划时进行了监视和监视。多年来,出于安全原因,无法对火灾受损区域进行侵入式检查。因此,使用悲观假设和最坏情况预测来构建早期拆卸计划。反过来,这导致了技术,财务和监管方面的障碍,而这些障碍被发现太高了,无法克服。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号