LINKAGE BETWEEN POST-CLOSURE SAFETY CASE REVIEW AND THE AUTHORISATION PROCESS FOR RADIOACTIVE WASTE DISPOSAL FACILITIES

机译:结束后安全案例审查与放射性废物处理设施授权过程之间的联系

获取原文

摘要

The Environment Agency (the Agency) has responsibilities under the Radioactive Substances Act 1993 (RSA93), for regulating disposal and storage of radioactive wastes in England and Wales, including regulation of the disposal site for UK solid low-level waste (LLW) at Drigg in Cumbria, NW England. To help inform the next review of the Drigg disposal authorisation, the Agency has required the operator, British Nuclear Fuels plc (BNFL) to submit a Post-Closure Safety Case (PCSC) which will assess the potential longterm impacts from the site. The Agency will review the PCSC, inter alia, to determine appropriate authorisation conditions and disposal limits. With the aim of using best practice to determine authorisation conditions, the Agency contracted Galson Sciences Ltd to undertake an international survey of authorisation procedures for comparable facilities in other countries. The overall objective of the review was to determine how PCSC review outputs may be used to support regulatory decisions. This paper provides an overview of the findings from the international survey, including discussion of: the authorisation process; information considered in the authorisation process; regulatory criteria; post-closure safety cases ; and, the regulatory decision-making process. In particular, the paper concentrates on issues that are regarded, from the Environment Agency’s perspective, as key points from the international survey pertinent to the future regulation of the BNFL Drigg disposal site. The paper also provides some initial views on how outputs from the PCSC review might be linked to the authorisation.
机译:环境署(原子能机构)在1993年的放射性物质法案(RSA93)下有责任,用于调节英格兰和威尔士的放射性废物的处置和储存,包括在Drigg的英国固体低级废物(LLW)的处置现场监管在坎布里亚州英格兰。为了帮助通知下次审查Drigg处置授权,该机构要求运营商英国核燃料PLC(BNFL)提交闭合后的安全案例(PCSC),这将评估该网站的潜在的长期影响。该机构将尤其是审查PCSC,以确定适当的授权条件和处置限制。随着使用最佳做法来确定授权条件,原子能机构合同甘森科学有限公司在其他国家的可比设施进行了国际授权程序调查。审查的总体目标是确定PCSC审查产出如何用于支持监管决策。本文概述了国际调查的调查结果,包括讨论:授权过程;在授权过程中考虑的信息;监管标准;后闭后安全案例;而且,监管决策过程。特别是,该论文集中在环境署的角度来看,从环境署的角度来看,从国际调查与未来的BNFL Drigg处置现场的监管有关的关键点。本文还提供了一些关于PCSC评论的输出如何链接到授权的初始视图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号