首页> 外文会议>Aerospace testing seminar >COST ENGINEERING – USING SIMPLIFIED COST MODELS TO EFFECTIVELY MANAGE LARGE SCALE DEVELOPMENT TEST ACTIVITIES
【24h】

COST ENGINEERING – USING SIMPLIFIED COST MODELS TO EFFECTIVELY MANAGE LARGE SCALE DEVELOPMENT TEST ACTIVITIES

机译:成本工程–使用简化的成本模型有效地管理大规模开发测试活动

获取原文

摘要

Large-scale “one-time” development test activities are often plagued by unexpected challenges. As a result, test directors and managers are often forced to make real-time mid-course corrections in an attempt to regain schedule or cost control. Unfortunately these decisions, when made on the basis of limited useful real-time information, often result in solutions that yield less than optimal results. This paper is an attempt to show how a Simplified Cost Model, tracking a limited set of parameters, can add significant value throughout the testing process. In addition to making projections and assessing progress, such a model can be the primary tool used to understand the scope of unexpected problems, develop and validate potential solutions, and determine the course of action which best meets the overall needs of the program.
机译:大规模的“一次性”开发测试活动通常受到意料之外的挑战的困扰。结果,测试主管和经理经常被迫进行中途实时更正,以期重新获得进度表或控制成本。不幸的是,这些决定是基于有限的有用实时信息做出的,通常会导致解决方案产生的结果低于最佳结果。本文试图说明简化成本模型如何跟踪一组有限的参数,从而在整个测试过程中增加可观的价值。除了做出预测和评估进度外,这种模型还可以用作了解意外问题范围,开发和验证潜在解决方案以及确定最能满足计划总体需求的行动方案的主要工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号