首页> 外文会议>New Development in Rock Mechanics Rock Engineering >STABILITY ANALYSIS AND EVALUATION OF XILUODU ARCH DAM
【24h】

STABILITY ANALYSIS AND EVALUATION OF XILUODU ARCH DAM

机译:溪洛渡拱坝稳定性分析与评价。

获取原文

摘要

This paper presents the elasto-plastic numerical and experimental results of Xiluodu arch dam-foundation system by employing a new FEM-TFINE code, fast Lagrangian method (FLAC-3D) and a geological mechanics model test whose scale is 1:250. By analyzing and comparing the numerical and experimental results, it is indicated that the results of numerical simulation agree well with the experimental results, and the dam failure mode of the left abutment is different from the right side because of different types of dam figures and geological conditions. The dam-foundation system is relatively poor so far as the whole system is considered. Firstly, the local slip fracture is formed on the foundation, then extends along the bottom of dam, and leads to instability and final failure. Thus, to reinforce the foundation or adjust the type of dam figure is suggested.
机译:本文采用新的FEM-TFINE编码,快速拉格朗日方法(FLAC-3D)和比例尺为1:250的地质力学模型试验,对溪洛渡拱坝基础系统进行了弹塑性数值和试验结果。通过对数值和实验结果的分析比较表明,数值模拟结果与实验结果吻合良好,并且由于坝型和地质类型的不同,左坝肩的溃坝方式与右侧不同。情况。就整个系统而言,大坝基础系统相对较差。首先,局部滑移裂缝在地基上形成,然后沿着大坝的底部延伸,从而导致失稳和最终破坏。因此,建议加强基础或调整坝型的类型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号