Development of The New Washington DC Convention Center -Heating Cooling and Power Plant

机译:新华盛顿特区会议中心的发展-供热制冷和发电厂

获取原文

摘要

Washington, DC continues to experience a tremendous growth in the number of visitors andConventions being held in our Nations Capital. In order to accommodate this tremendousgrowth the Washington Convention Center Authority developed an innovative concept for anentirely new world-class facility. During the initial planning stages of this new $756 millionfacility, the Washington Convention Center Authority recognized the significance ofimplementing the most efficient and reliable energy system possible, and they wanted aninnovative, local, experienced team to ensure it’s success. The scope of the Energy Servicesfor this 2.3 million square foot facility includes 10,500 tons of chilled water and 50,000,000BTU’s of hot water capacity.A partnership of Pepco Energy Services and Trigen Energy Corporation was selected todesign, procure, construct, commission, operate and maintain, the Heating, Cooling andPower Plant.
机译:华盛顿特区的游客人数持续增长, 在我们国家首都举行的公约。为了容纳这个巨大的 华盛顿会议中心管理局的发展为 全新的世界一流设施。在这笔新的7.56亿美元的初始计划阶段 设施,华盛顿会议中心管理局意识到了 实施最高效,最可靠的能源系统,他们希望 创新,本地,经验丰富的团队来确保成功。能源服务范围 这个230万平方英尺的工厂包括10,500吨冷水和50,000,000吨 BTU的热水容量。 Pepco Energy Services和Trigen Energy Corporation的合作伙伴关系被选中 设计,采购,建造,调试,操作和维护,加热,冷却和 发电厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号