首页> 外文会议>Reservoirs in a Changing World >Long term behaviour of Portumna embankments
【24h】

Long term behaviour of Portumna embankments

机译:Portumna路堤的长期行为

获取原文

摘要

Monitoring of the settlement of Portumna flood protection banks has been carried out since construction in 1929, producing unique long-term data. Analyses show that it is possible to make accurate predictions of such long term settlements, provided issues such as lateral squeezing of the soils and creep are accounted for. It is also shown that sample disturbance effects play a significant role in obtaining parameters for calculations. The samplers commonly used in Ireland and the UK may not be adequate for important works on soft soil. Finite element analyses suggest that the state of stress in the ground beneath the embankments is such that future loading is feasible.
机译:自1929年建造以来,一直对Portumna防洪堤的沉降进行监测,产生了独特的长期数据。分析表明,只要考虑到土壤的横向挤压和蠕变等问题,就可以对此类长期沉降做出准确的预测。还表明,样本扰动效应在获得计算参数方面起着重要作用。爱尔兰和英国常用的采样器可能不足以在柔软的土壤上进行重要的工作。有限元分析表明,路堤下方地面的应力状态使得将来的荷载是可行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号