首页> 外文会议>Reservoirs in a Changing World >Ghazi-Barotha hydropower project: social issues and engineering design
【24h】

Ghazi-Barotha hydropower project: social issues and engineering design

机译:Ghazi-Barotha水电项目:社会问题与工程设计

获取原文

摘要

The Ghazi-Barotha hydropower project in Pakistan is one of the largest currently under construction worldwide. The project demonstrates the capacity of engineers and social scientists to work together to avoid severe social impacts, with social considerations factored into the project design from the pre-feasibility stage. It was the first such project to integrate World Bank Operational Directives on resettlement and cultural properties into project design. The Resettlement Action Plan was regarded as the standard for 'world best practice' and continues to influence the design of projects elsewhere in the developing world. Well before the work of the World Commission on Dams, the design of the project covered many of the criteria and guidelines presented in their report, Dams and development: a new framework for decision-making.
机译:巴基斯坦的Ghazi-Barotha水电项目是目前全球最大的在建项目之一。该项目展示了工程师和社会科学家共同努力避免严重的社会影响的能力,并且从预可行性阶段就将社会考虑因素纳入了项目设计中。这是第一个将世界银行关于移民安置和文化财产的业务指令纳入项目设计的项目。 《移民行动计划》被视为“世界最佳实践”的标准,并继续影响着发展中国家其他地方的项目设计。在世界水坝委员会开展工作之前,该项目的设计涵盖了其报告《水坝与发展:决策的新框架》中提出的许多标准和准则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号