首页> 外文会议>Seventeenth European Photovoltaic Solar Energy Conference >DEPLOYMENT OF PHOTOVOLTAIC TECHNOLOGIES: CO-OPERATION WITH DEVELOPING COUNTRIES. TASK 9 OF THE INTERNATIONAL ENERGY AGENCY'S PHOTOVOLTAIC POWER SYSTEMS PROGRAMME
【24h】

DEPLOYMENT OF PHOTOVOLTAIC TECHNOLOGIES: CO-OPERATION WITH DEVELOPING COUNTRIES. TASK 9 OF THE INTERNATIONAL ENERGY AGENCY'S PHOTOVOLTAIC POWER SYSTEMS PROGRAMME

机译:部署光伏技术:与发展中国家的合作。国际能源机构的光伏发电系统计划任务9

获取原文

摘要

This paper presents the progress of Task 9 of the International Energy Agency's Photovoltaic Power Systems Programme. The overall mission of the IEA PVPS Programme is to encourage international collaboration efforts through which photovoltaic energy becomes a significant renewable energy option in the near future. The objective of Task 9 is to further increase the overall rate of successful deployment of PV systems in developing countries where PV is often the only viable option for remote electrification. With this in mind Task 9 is co-operating with developing countries and international financial institutions. The following countries are actively participating in the work of Task 9: Australia, Canada, Denmark, Finland, France, Germany, Italy, Japan, Switzerland, the United Kingdom, and the USA as well as participation from the World Bank, UNEP and UNDP. The work of the task has been split into three activities: deployment infrastructure; support and co-operation; and the technical and economic aspects of PV in developing countries. This paper describes the progress of Task 9 to date within the three activities. The work has included the compilation and analysis of information from case studies on PV deployment and the preparation of an overview document highlighting the key issues of PV deployment in developing countries. The progress on the preparation of Recommended Practice Guides covering issues such as quality assurance and accreditation, financing mechanisms and institutional frameworks is also detailed. The paper details the work carried out with developing nations, international bodies and multi-lateral/bilateral agencies. Task 9 has had an important input to the G8 Renewable Energy Task Force. Four workshops have been held to stimulate awareness and interest on the technical and economic potential, opportunities and recommended practice of PV systems. This has enabled the participants to obtain the expertise and knowledge that is required to prepare PV programmes and initiate appropriate PV system deployment.
机译:本文介绍了国际能源机构光伏发电系统计划任务9的进展。 IEA PVPS计划的总体使命是鼓励国际合作,使光伏能源在不久的将来成为重要的可再生能源选择。任务9的目标是进一步提高发展中国家的光伏系统成功部署的总体速度,在这些国家,光伏通常是远程电气化的唯一可行选择。考虑到这一点,任务9正在与发展中国家和国际金融机构合作。以下国家/地区积极参与任务9的工作:澳大利亚,加拿大,丹麦,芬兰,法国,德国,意大利,日本,瑞士,英国和美国,以及世界银行,环境署和开发计划署的参与。该任务的工作分为三个活动:部署基础架构;支持与合作;以及发展中国家光伏发电的技术和经济方面。本文介绍了这三个活动中任务9的进度。这项工作包括汇编和分析有关光伏部署的案例研究中的信息,并编写一份概述文件,重点介绍发展中国家光伏部署的关键问题。还详细介绍了《建议操作指南》的编写进度,该指南涵盖了质量保证和认证,融资机制和体制框架等问题。该文件详细介绍了与发展中国家,国际机构和多边/双边机构进行的工作。任务9为八国集团(G8)可再生能源任务组提供了重要投入。已经举办了四期讲习班,以激发人们对光伏系统的技术和经济潜力,机会和推荐做法的认识和兴趣。这使参与者能够获得准备PV计划和启动适当的PV系统部署所需的专业知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号