首页> 外文会议>International joint conference on Autonomous agents and multiagent systems >Risk and expectations in a-priori time allocation in multi-agent contracting
【24h】

Risk and expectations in a-priori time allocation in multi-agent contracting

机译:多主体签约中先验时间分配中的风险和期望

获取原文

摘要

In related research we have proposed a market architecture for multi-agent contracting and we have implemented prototypes of both the market architecture and the agents in a system called MAGNET. A customer agent in MAGNET solicits bids for the execution of multi-step plans, in which tasks have precedence and time constraints, by posting a Request for Quotes to the market. The Request for Quotes needs to include for each task its precedence constraints and a time window. In this paper, we study the problem of optimizing the time windows in the Requests for Quotes. Our approach is to use the Expected Utility Theory to reduce the likelihood of receiving unattractive bids, while maximizing the number of bids that are likely to be included in the winning bundle. We describe the model, illustrate its operation and properties, and discuss what assumptions are required for its successful integration into MAGNET or other multi-agent contracting systems.
机译:在相关研究中,我们提出了用于多主体合同的市场架构,并且已经在称为MAGNET的系统中实现了市场架构和主体的原型。 MAGNET中的客户代理通过向市场发布报价请求,为执行具有优先级和时间限制的多步骤计划招标。报价请求需要为每个任务包括其优先级约束和一个时间窗口。在本文中,我们研究了优化报价请求中的时间窗口的问题。我们的方法是使用期望效用理论来减少接收不具吸引力的投标的可能性,同时最大化可能包含在中标捆绑中的投标数量。我们将描述该模型,说明其操作和属性,并讨论将其成功集成到MAGNET或其他多代理签约系统所需的假设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号