首页> 外文会议>International conference on ground control in mining >Development Process for a Greater Capacity Propsetter? System
【24h】

Development Process for a Greater Capacity Propsetter? System

机译:更大容量的开发过程?系统

获取原文

摘要

Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed (Barczak, Dolinar, and Mucho, 1999). As longwall tailgate support technologies continue to be developed and improved, Strata Worldwide has worked to design and manufacture a revised Propsetter to provide additional support capacity and enable applications at greater mine heights. The support is targeted for tailgate applications; however, it can also be used for roof support in various types of mining environments. This paper describes the design changes for enhancing the support capacity of the Propsetter to more closely align its performance with other support technologies currently being employed in longwall tailgates. Balancing changes to each design aspect of the Propsetter was key to successfully improving the roof support load capacity while maintaining controlled deformation. Increasing the load capacity would allow a mine to improve support efficiency with a smaller, less intrusive support compared to support alternatives and to reduce the cost per foot of supported entry. The target support capacity was 80 to 100 tons at two inches of deformation to more closely match the performance of competing tailgate supports, such as the 24-inch-diameter CAN?. To achieve this goal, changes were made to all design aspects of the Propsetter: diameter, wedge cut depth and angle, pod size, and confinement rings. Test results from the NIOSH Mine Roof Simulator verified that these design changes were successful in increasing the capacity of the Propsetter to the 80- to 100-ton range at two inches of deformation.
机译:门道的适当地面稳定性是长墙矿业成功的关键方面。特别是,后挡板已被证明是需要管理的更活跃的矿区之一(Barczak,Dolinar和Modo,1999)。由于Longwall Tailgate支持技术继续开发和改进,Strata Worldwide已经致力于设计和制造修订的预订器,以提供额外的支持能力,并在更大的矿井高度启用应用。支持是针对后挡板应用的目标;然而,它也可以用于各种类型的采矿环境中的屋顶支撑。本文介绍了提高预订器的支持能力的设计变更,以便将其与目前在Longwall尾板中使用的其他支持技术进行平时对齐其性能。平衡对预售器的每个设计方面的变化是在保持受控变形的同时成功改善屋顶支撑负载容量的关键。与支持替代方案相比,增加负载能力允许矿井提高支持效率,以较小,更少的侵入性支持,并降低受支持进入的每足脚的成本。目标支撑能力为80至100吨,以两英寸的变形,更紧密地匹配竞争尾板支撑的性能,例如24英寸直径罐式罐子呢?为实现这一目标,对预售器的所有设计方面进行了变化:直径,楔形深度和角度,吊舱尺寸和限制环。 Niosh矿山屋顶模拟器的测试结果证实,这些设计变化成功地提高了预诱导器到80至100吨范围的成功,以两英寸的变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号