首页> 外文会议>International conference on ground control in mining >Estimation of In-situ Stress at Ikeshima Colliery Using AE and DRA Method
【24h】

Estimation of In-situ Stress at Ikeshima Colliery Using AE and DRA Method

机译:用AE和DRA方法估算池岛煤矿的原地应力。

获取原文

摘要

A low cost methodology that allows the determination of in-situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages of a project, even in undeveloped areas of a mine. The research aim was to compare the experimental results estimated by the AE and DRA methods to those estimated by conventional ANZI (Australia and New Zealand Inflatable) cell measurements. The studies have been focused on full stress tensor determination from a single oriented cored rock. In all cases the rock core specimens recollected the in-situ stress reasonably well compared with the standard overcoring method.
机译:研究了一种低成本的方法,该方法可以使用定向的岩心样品确定原位应力。该技术可用于确定项目早期阶段的压力,即使在矿山未开发的地区也是如此。该研究的目的是将通过AE和DRA方法估算的实验结果与通过常规ANZI(澳大利亚和新西兰充气)细胞测量估算的结果进行比较。这些研究集中在确定单一取向岩心的全应力张量。在所有情况下,与标准的过芯方法相比,岩心样本都可以很好地回收原位应力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号