首页> 外文会议>International bridge conference >Inspection of the Glen Canyon Dam Access Tunnel in Page, Arizona
【24h】

Inspection of the Glen Canyon Dam Access Tunnel in Page, Arizona

机译:检查Glen Canyon Dam Access隧道,亚利桑那州,亚利桑那州

获取原文

摘要

The Glen Canyon Dam Access Tunnel, owned by the United States Bureau of Reclamation (USBR), is a two mile long, 24-ft high, and 22-ft wide horseshoe shaped tunnel located in Page, Arizona. The tunnel was completed in 1958 and was driven through massive Navajo Sandstone by the drill-and-blast method. The tunnel has limited access and is used by the USBR on a daily basis to access the Power Plant at the base of the dam. Summertime sees an increase in daily traffic by commercial Whitewater rafting enterprises using the tunnel to access the Colorado River. The paper describes the on-site inspection of the tunnel to document the physical and functional conditions of the tunnel structure. The approach to the inspection and documentation of results was based on methods described in the Federal Highway Administration (FHWA) Tunnel Operations, Maintenance, Inspection, and Evaluation (TOMIE) Manual. The inspection team performed an in-depth inspection, including full arch periphery geologic mapping of the entire tunnel including a cast-in-place concrete section. The inspection included mapping of all rock bolts that appeared deteriorated, loose, or noted to be in poor condition by previous USBR maintenance team inspections. Geologic characterization included mapping structural rock features such as bedding planes, joints, fractures, and faults. All geologic and ground support features were recorded and documented on full periphery mapping sheets. The presentation provides a case history of inspection of a roadway tunnel which includes multiple types of tunnel lining support systems including cast-in-place concrete, structural steel sets and rock bolts.
机译:由美国填海局(USBR)拥有的Glen Canyon Dam Access隧道,是两英里的长,高24英尺高,22英尺宽的马蹄形隧道位于亚利桑那州的页面上。隧道于1958年完成,通过钻头和鼓泡法通过大规模的Navajo砂岩驱动。隧道访问有限,并每天使用USBR使用,以便在大坝底部进入电厂。夏季通过隧道进入科罗拉多河,商业白水漂流企业每日交通增加日常交通。本文描述了隧道的现场检查,以记录隧道结构的物理和功能条件。结果的方法和结果的文献是基于联邦公路管理局(FHWA)隧道运营,维护,检验和评估(Tomie)手册中描述的方法。检查团队进行了深入的检查,包括整个隧道的全拱形外围地质映射,包括铸造混凝土部分。检查包括所有岩石螺栓的映射,这些岩石螺栓似乎恶化,松动,或者通过之前的USBR维护团队检查陷入困境。地质表征包括映射结构岩体特征,如床上用品,关节,裂缝和故障。在全周期映射表上记录和记录所有地质和地面支持功能。该介绍提供了一种检查道路隧道的案例历史,其包括多种类型的隧道衬里支撑系统,包括铸造混凝土,结构钢结构和摇滚螺栓。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号