Challenging Solutions to High Capacity Rock Anchors

机译:具有挑战性的高容量岩石锚固解决方案

获取原文

摘要

High Rock Dam, a 75-year old concrete gravity structure approximately 935 ft long,required remediation of the spillway in order to meet the factor of safety criteria for theproject design loadings. High Rock Dam is located in North Carolina on the Yadkin River,and is owned and operated by the Yadkin Division of Alcoa Power Generating Inc. Theremediation plan included the installation of 19 multi-strand, epoxy coated and filled, highcapacity post-tensioned anchors with capacities up to 1850 kips. The anchors wereinclined 28 degrees from vertical and oriented in an upstream direction. In general, anchorcapacities were maximized by locking-off at 70% of the ultimate strength, therebymaximizing the reserve capacity in the event of future changes in the design loadings.This paper discusses the development and execution of the rock anchor program at HighRock Dam, the field problems encountered and the resolution of each problem by theProject Team that consisted of the Owner, Engineer, Contractor, and the Federal EnergyRegulatory Commission (FERC).
机译:高岩坝(High Rock Dam),这是一座已有75年历史的混凝土重力结构,长约935英尺, 要求对溢洪道进行整治,以符合溢洪道安全标准。 项目设计负荷。高岩坝位于北卡罗来纳州亚德金河上, 由美国铝业发电公司Yadkin部门拥有和运营。 修复计划包括安装19条多股环氧涂层和填充的高 承载能力达1850 kips的后张锚。锚是 从垂直方向倾斜28度并沿上游方向定向。一般而言,锚点 通过将极限强度锁定在70%,从而最大程度地提高了生产能力,从而 如果设计负荷将来发生变化,则可以最大程度地提高备用容量。 本文讨论了High Rock岩锚程序的开发和执行 岩坝,遇到的现场问题以及解决每个问题的方法 由业主,工程师,承包商和联邦能源部组成的项目团队 监管委员会(FERC)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号