首页> 外文会议>Annual Lawrence Reid gas conditioning conference;LRGCC >GLYCOL PRE-DEHYDRATIONOF GASBEFORE A CONTACTOR
【24h】

GLYCOL PRE-DEHYDRATIONOF GASBEFORE A CONTACTOR

机译:接触器前乙二醇的预脱水

获取原文

摘要

A patent pending means of pre-dehydrating gas before entry into a contactor has beendeveloped and field-tested that improves the performance of glycol dehydrationequipment. The system consists of a means of extracting glycol from a contactor after ithas already contacted gas and reintroducing it before the contactor to achieve anupstream contact with the gas stream. The overall flow scheme is one of bothcountercurrent flow and concurrent flow contact.This results in a partial dehydration of gas occurring before it enters the contactor. Theefficiency of the pre-contact averages about 91% of a theoretical stage. This enhancesthe overall efficiency of the contactor and moves any water based corrosion or scalebuild-up outside of the contactor. The pre-dehydration can be used for any glycoldehydration system but is particularly applicable for gas that contains hydrogen sulfideor high quantities of carbon dioxide.This paper discusses how a glycol contactor in high CO2 and H2S service has beensuccessfully installed and operated. The gas stream that is dehydrated contains about85% CO2 and about 1.8% H2S. The equipment has been in operation for more thantwo years. During that time no maintenance has been required on the pre-dehydrationequipment. Since operation commenced there has been no downtime associated withthe pre-dehydrator or the contactor. After one and one half years of operation thecontactor was opened and inspected. There was only minor scale build-up and nocorrosion even though the contactor is made of standard carbon steel construction.
机译:在进入接触器之前对气体进行预脱水的方法正在申请专利 经过开发和现场测试,可改善乙二醇脱水的性能 设备。该系统由一种从接触器中提取乙二醇的装置组成。 已经接触过气体并在接触器接触之前重新引入气体 上游与气流接触。整体流程方案是两者之一 逆流和并发流接触。 这导致气体在进入接触器之前发生部分脱水。这 预接触的平均效率约为理论阶段的91%。这增强了 接触器的整体效率并移动任何水基腐蚀或水垢 在接触器外堆积。预脱水可用于任何乙二醇 脱水系统,但特别适用于包含硫化氢的气体 或大量的二氧化碳。 本文讨论了如何在高CO2和H2S服务中使用乙二醇接触器 成功安装并运行。脱水的气流包含约 85%的二氧化碳和约1.8%的硫化氢。该设备已经运行了超过 两年在此期间,无需对预脱水进行维护 设备。自操作开始以来,没有发生与之相关的停机时间 预脱水器或接触器。经过一年半的运行 接触器已打开并已检查。只有小规模的积累,没有 即使接触器是由标准碳钢结构制成的,也会腐蚀。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号