首页> 外文会议>New horizons in drinking water >INTEGRATED RESOURCE PLANNING
【24h】

INTEGRATED RESOURCE PLANNING

机译:综合资源规划

获取原文

摘要

This paper summarizes Chapter 10 "Integrated Resource Planning" in the new AWWA manual M50. Integrated Resource Planning or IRP is viewed as a process to tie all of the individual elements of water resources planning together. A model IRP process is described to provide a structure for preparing an integrated resource plan. The major differences between conventional water resource planning and IRP include giving equal consideration to demand management and new supply development, consideration of risk and reliability with shortage management as an option, extensive public participation in the process. Selection of an integrated resource plan should consider cost-effectiveness, supply reliability, environmental impacts, financing, and public acceptability.
机译:本文总结了新的AWWA手册M50中的第10章“集成资源计划”。综合资源规划或IRP被视为将水资源规划的所有各个要素联系在一起的过程。描述了模型IRP过程,以提供用于准备集成资源计划的结构。常规水资源计划和IRP之间的主要区别包括:同等考虑需求管理和新供应开发;风险和可靠性的考虑,可以选择短缺管理;公众对此过程的广泛参与。选择综合资源计划应考虑成本效益,供应可靠性,环境影响,融资和公众接受度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号