首页> 外文会议>International conference on nuclear engineering;ICONE-8 >Cured-in-place piping application for structural and pressure boundary integrity
【24h】

Cured-in-place piping application for structural and pressure boundary integrity

机译:就地固化的管道应用可实现结构和压力边界的完整性

获取原文

摘要

The use of insitu methods to rehabilitate buried or inaccessible piping systems is an emerging technology which has received recognition as an ASME XI Code approved alternate to traditional repair practices. This type repair requires the insertion of a carrier tube, containing thermosetting resins and reinforcement fillers into the host pipe. The length of the carrier tube is only limited by the pot life of the resin and restrictions of piping geometry. Once the insertion is completed, the resin is cured using hot water, air or steam, which is circulated through the host pipe. After curing, the resultant product is a form-fitted structurally reinforced resin pipe within the existing host piping. The Cured-In-Place Pipe (CIPP) has mechanical properties similar to those of fiberglass piping. The savings of this type repair, in both system downtime and replacement cost, is substantial. This methodology provides utilities with a technically sound, economically fasible soution to buried piping repairs and the ASME Section XI Code Case N-589 provides the requirements for materials, design and installation.
机译:使用现场方法修复埋藏的或无法进入的管道系统是一项新兴技术,已获得认可,是ASME XI规范认可的替代传统修理方法的一种技术。这种类型的维修需要将包含热固性树脂和增强填料的载管插入主机管。承载管的长度仅受树脂的适用期和管道几何形状的限制。插入完成后,可使用热水,空气或蒸汽使树脂固化,然后将其循环通过主管。固化后,所得产品为现有主管道内的形状匹配的结构增强树脂管道。就地固化管(CIPP)具有与玻璃纤维管道相似的机械性能。这种类型的维修在系统停机时间和更换成本方面均节省了可观的费用。这种方法为公用事业提供了技术上合理,经济上可行的解决方案,可用于地下管道的维修,ASME XI法规案例N-589规定了对材料,设计和安装的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号