首页> 外文会议>World petroleum congress >SUCCESSFUL CO-COMPOST REMEDIATION PROJECT POINTSTHE WAY TO 45 REDUCTION IN OIL SPILL CONTAMINATED SOILREMEDIATION COSTS
【24h】

SUCCESSFUL CO-COMPOST REMEDIATION PROJECT POINTSTHE WAY TO 45 REDUCTION IN OIL SPILL CONTAMINATED SOILREMEDIATION COSTS

机译:成功的堆肥整治工程指出,将油污污染的土壤整治成本减少45%

获取原文

摘要

Starting in the fall of 1998, Millennium EMS Solutions Ltd. Undertook a co-compostremediation program on behalf of Gulf Canada Resources Limited involving oil contaminated soil at a pipelinebreak located near Gilby, Alberta. Approximately 1100m3 of heavy clay textured, hydrocarbon contaminatedsoil (5,000 to 6,000 ug/g TPH) was windrowed, treated with soil amendments (manure, fertilizer and woodwaste), windrow turned two times and left to digest over the cold winter months. In early spring, the windrowswere turned two more times. The results of the soil sampling and analysis completed 210 days after initiationshow the soil to have been remediated to below Alberta Tier 1 cleanup criteria (1000 ug/g). Toxicological testsfor aquatic and terrestrial systems have been successfully conducted to confirm the clean levels of theremediated soil.The co-composting remediation of the additional 2000m3 of hydrocarbon contaminated soil commenced inJuly, 1999. The results from this phase have not available when this paper was prepared but are expected to besimilar. They are expected to be presented at the World Petroleum Congress in June, 2000.
机译:从1998年秋天开始,Millennium EMS Solutions Ltd.承担了共同费用。 代表加拿大海湾资源有限公司进行的修复计划,涉及管道中受油污染的土壤 休息位于艾伯塔省吉尔比附近。约1100m3重质粘土,碳氢化合物污染 将土壤(5,000至6,000 ug / g TPH)堆放在一起,并用土壤改良剂(肥料,肥料和木材)处理 ),草堆翻了两次,在寒冷的冬季里被消化了。早春时分 被翻了两次。启动后210天完成土壤采样和分析的结果 表明土壤已被修复至低于艾伯塔省一级清洁标准(1000 ug / g)。毒理学测试 已经成功进行了水生和陆地系统的使用,以确认水生和陆地系统的清洁水平。 修复土壤。 于2000年开始对另外2000m3的碳氢化合物污染土壤进行堆肥整治。 1999年7月。准备本文件时尚无法获得此阶段的结果,但预计会得到 相似的。预期将在2000年6月的世界石油大会上提出这些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号