USING PROJECT MANAGEMENT TECHNIQUES TO DELIVERBEST IN CLASS DRILLING PERFORMANCE

机译:使用项目管理技术交付一流的钻探性能

获取原文

摘要

Drilling operations are notorious for suffering from significant over-runs in both cost andschedule. These characteristics are symptomatic of defective project management. BP Amoco hasacquired a unique set of project management tools and applied them to their drilling campaigns of 1998and 1999. The results show that ambitious project schedules can be achieved and where problemsoccur, recovery is both rapid and effective.Risk assessment is a key thread that runs through, from the high level risks in a conceptual design tothe details of day to day execution. It is tightly linked to the process for estimating well times andcontingency costs and provides a means of communicating risks to business delivery upwards tomanagement.A correct set of well objectives and basis of design is the foundation of an effective detailed planningphase involving a large team of contractors. Key to the success of planning and execution is theintegration of the service suppliers and drilling contractor into a comprehensive planning effort.Standard project management techniques are combined with the structuring of the organisation rounddelivery of key elements of the well to ensure that a large project team is properly focused on deliveringa world class operational target.Detailed planning ensures flawless operation and efficient recovery from setbacks. The rig team iscritical to getting the detail right. Rigorous post analysis is essential to ensure that lessons learned, notonly about the technical aspects of the well, but also the process, are fed back into the planning offuture operations.
机译:钻井作业因成本和成本都严重超支而臭名昭著。 日程。这些特征是缺陷项目管理的征兆。 BP Amoco有 获得了一套独特的项目管理工具,并将其应用于1998年的钻探活动 和1999年。结果表明,雄心勃勃的项目进度表可以实现,并且可以解决问题 发生时,恢复既快速又有效。 风险评估是贯穿概念设计中的高级别风险到贯穿整个过程的关键线程。 日常执行的详细信息。它与估算钻井时间的过程紧密相关,并且 意外费用,并提供一种向上传递风险的方法,以将业务交付给 管理。 一套正确的油井目标和设计基础是有效详细计划的基础 此阶段涉及一大批承包商。计划和执行成功的关键是 将服务供应商和钻井承包商整合到一个全面的计划工作中。 标准项目管理技术与组织架构的结合 交付井的关键要素,以确保大型项目团队正确地专注于交付 世界一流的运营目标。 详细的计划可确保完美无缺的操作并有效地从挫折中恢复过来。钻机团队是 正确处理细节至关重要。严格的后期分析对于确保汲取的经验教训至关重要,而不是 不仅涉及油井的技术方面,而且涉及过程,都反馈到油井的规划中 未来的运作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号