首页> 外文会议>European conference on industrial furnaces and boilers >Hybrid Gas-Steam Combined Plants Equipped with Cpfbc Part One: Design Point Calculation
【24h】

Hybrid Gas-Steam Combined Plants Equipped with Cpfbc Part One: Design Point Calculation

机译:装备有Cpfbc的混合气-气联合工厂第一部分:设计点计算

获取原文

摘要

The paper deals with design aspects of Hybrid Gas-Steam Combined Plants equipped with Circulating Fludized Bed Combustors. Two plant schemes have bene investigated, Gas Turbine arrangements being the main difference. Commercially available machinery has been empolyed, in order to achieve the best matching among plant compo9nents their flow function modifications have been investigated. Results are given and discussed.
机译:本文论述了配备循环流化床燃烧器的混合气-气联合装置的设计方面。已经对两种电厂方案进行了研究,其中燃气轮机布置是主要区别。为了使工厂部件之间达到最佳匹配,已经对商用机械进行了优化,并对其流量功能进行了研究。结果给出并讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号