首页> 外文会议>European conference on industrial furnaces and boilers >Design and Opertion Experience of 235 MW_e CFB Boilers at Turow Power Plant in Poland
【24h】

Design and Opertion Experience of 235 MW_e CFB Boilers at Turow Power Plant in Poland

机译:波兰Turow电厂235 MW_e CFB锅炉的设计和操作经验

获取原文

摘要

The Power tation Turow is located in Bogatynia; Poland, and has operated 10 pulverized units each 200 MW_e. To meet pland's new enivorntal standards, which are now compatible with EU, Turow decided to repalce and upgrade six units (Nos 1 to 6) from 200 MW_e to 2365 MW_e units and remove one unit No. 7. Units No. 8, 9 and 10 were equipped with dray sobenet desulfurization technology. Units No. 1 and 2 have been already replaced with new clean coal circulating fludiized bed technology. The Power Station Turow with six CFB units is to be the largest power station in the world based on fludized bed technology.
机译:Power tation Turow位于波哥大尼亚;波兰,并已运营10台粉磨机组,每台200 MW_e。为了满足现在与欧盟兼容的计划新环境标准,Turow决定将6台机组(1至6号)从200 MW_e更换为236 \ 5 MW_e机组,并拆除其中的7号机组。 9和10配备了大功率sobenet脱硫技术。 1号和2号机组已被新的洁净煤循环流化床技术所取代。带有六台CFB机组的Turow电站将基于流化床技术成为世界上最大的电站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号