...
首页> 外文期刊>VGB PowerTech >Operating experience with the 235 MWe lignite-fired CFB boilers at the Turow power plant
【24h】

Operating experience with the 235 MWe lignite-fired CFB boilers at the Turow power plant

机译:在Turow电厂使用235 MWe褐煤CFB锅炉的运行经验

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The CFB boilers at the Turow power plant in Poland are three Foster Wheeler CEB Units with a design main steam flow of 185.4 kg 5 at 540 ℃, 13.17 MPa and a reheat steam flow of 165.5 kg s at 540 ℃ and 2.45 MPa. As the CFB technology is being constantly improved, the Turow power plant made a decision to construct new units with increased efficiency (91 %) using the latest CFB technology. The capacity of three new units is increased to 260 MWe each staying within the existing footprint.
机译:波兰Turow电厂的CFB锅炉是三台Foster Wheeler CEB机组,其设计主蒸汽流量在540℃,13.17 MPa时为185.4 kg 5,在540℃和2.45 MPa时的再热蒸汽流量为165.5 kg s。随着CFB技术的不断改进,Turow电厂决定使用最新的CFB技术以更高的效率(91%)建造新机组。三个新单元的容量增加到260 MWe,每个都保持在现有的空间内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号