首页> 外文会议>ETCE/OMAE joint conference >Numerical simulation of the collision of drilling risers with mooring lines in offshore oil exploitation
【24h】

Numerical simulation of the collision of drilling risers with mooring lines in offshore oil exploitation

机译:海上石油开采中钻井隔水管与系泊缆碰撞的数值模拟

获取原文

摘要

Many important operations in offshore oil industry such as drilling, completion or workover are being performed in congested areas, with increasing proximity between dynamic positioning (DP) drilling units and other production units based on ships or platforms. The drilling column of a DP unit is contained in a rigid riser, connected to a wellhead on the seabottom. If, for some reason, a DP unit operating near to a production unit loses control of its position, it disconnects the riser from the wellhead and may follow a trajectory that leads to the collision of the riser with a mooring line of the production unit.
机译:海洋密集型行业中的许多重要作业,例如钻井,完井或修井,都在拥挤的地区进行,动态定位(DP)钻井装置与其他基于船舶或平台的生产装置之间的距离越来越近。 DP装置的钻柱包含在刚性立管中,该立管连接到海底的井口。如果出于某种原因,在生产单元附近工作的DP单元失去了对其位置的控制,则会将立管与井口断开连接,并可能遵循一条轨迹,导致立管与生产单元的系泊缆发生碰撞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号