首页> 外文会议>ETCE/OMAE joint conference >Development and coast guard approval of a composite piping system
【24h】

Development and coast guard approval of a composite piping system

机译:复合管道系统的开发和海岸警卫队批准

获取原文

摘要

The US Coast Gurard has been proactive in the development of their Policy FIle Memorandum (PFM) for composite piping of offshore platforms. At oone time the requirements of IMO A753(18), which were for shipboard use, were applied to offshore platforms. His required any firevwater piping to be tested in a furnace for 1 hour dry with no water in the pipe, and no leakage allowed when hydro tested. The US Coast Guard realized that an open type platofmr that would be abandoned at the first sign of fire was not the same as an enclosed ship that could not just be abandoned. The PFM allows for the piping to be tested to IMO Level II (30 minutes loaded with water), when certain design restraints are followed.
机译:美国海岸古拉德一直积极开发其用于海上平台复合管道的政策备忘录(PFM)。一次将IMO A753(18)的有关船上用途的要求应用于海上平台。他要求将任何消防用水管道在炉中干燥1小时,管道中无水,并且进行水压测试时不得泄漏。美国海岸警卫队意识到,开火的第一个迹象将被抛弃的开放式platofmr与不能被抛弃的封闭式船舶不同。当遵循某些设计约束条件时,PFM允许对管道进行IMO II级测试(加水30分钟)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号