首页> 外文会议>Annual offshore technology conference >Cost effective development of a remote field: installation of the laminaria and corallina subsea facilities
【24h】

Cost effective development of a remote field: installation of the laminaria and corallina subsea facilities

机译:经济有效地开发偏远地区:安装海带和珊瑚海底海底设施

获取原文

摘要

Woodside Energy Ltd, together with its co-venturers BHP Petroleum and shell Development Australia, are developing the Laminaria and Corallina fields in Bolck AC/P8 of the Timor Sea, offshor nothern Australia. The development concept comprises a new-build FPSO supplied by six subsea wells, two manifolds and a network of flowlines, numbilicals and risers. Water depths range from 380-r20 metres across the fields, and all subsea facilities are designed for diverless installation and operation. The two-hase installation campaign commenced in September 1998 and the fields are due to commence operations in October 1999.
机译:伍德赛德能源有限公司(Woodside Energy Ltd)及其合作伙伴必和必拓石油公司(BHP Petroleum)和澳大利亚壳牌开发公司(Shell Development Australia)正在澳大利亚北部沿海地区帝汶海的Bolck AC / P8开发Laminaria和Corallina油田。该开发概念包括由六个海底井,两个歧管以及输油管线,油管和立管网络提供的新型FPSO。整个田间的水深范围在380-r20米之间,所有海底设施均设计用于无级安装和操作。两罩安装运动于1998年9月开始,这些油田应于1999年10月开始运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号