Approximately fifty new submarine pipelines are currently being added to the eighty existing pipelines within the Cantarelly Field. When all pipelines are complete, there will be approximatley two hundred new pipeline crossings. The existing pipelines, many of which are exposed on the seabed, must continue in service during new pipeline crossing installatioin. As the new pipelines are required to be buried with 1m cover, the perferred crossing method reqjired lowering the existing pipeline into the seabed. This paper reviews the design approach, crossing types selected and construction methods for safely crossing the existing operating pipelines. with limited as-buklt information availalbe, on site surveys, conservative assumptions and reverse engineering were required.
机译:目前,在Cantarelly油田内现有的80条现有管道中,大约增加了50条新的海底管道。当所有管道完工后,将有大约200条新的管道交叉口。现有的管道(其中许多管道暴露在海底)必须在新的管道穿越安装期间继续使用。由于要求将新管道埋入1m的覆盖层中,因此需要采用交叉法将现有管道降低到海床中。本文回顾了安全穿越现有运营管道的设计方法,选择的穿越类型和施工方法。由于提供的概要信息有限,因此在现场调查中,需要保守的假设和逆向工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号