SIMULATION OF THE LOAD FOLLOWING CAPABILITY OF A REPOWERED PLANT DURING THE FIRST PHASE OF THE SYSTEM RESTORATION

机译:在系统恢复的第一阶段,改造植物的负荷跟随能力的模拟

获取原文

摘要

The Italian restoration plan after a black out relies traditionally on the black-start capabilities of hydro power stations to start-up thermal units. During the last ten years, some of the Italian thermal plants have been repowered with combined cycles by topping the existing steam sections with gas turbines. Aim of this paper is to investigate whether and how the black-start capability of power plants gas sections could be used to start up the steam sections. This would improve the speed and reliability of the early restoration procedure. For such a purpose, a numerical simulator has been built using the Lego modular code, which allows getting a deeper insight about all problems concerning the black start-up procedure. The paper presents the results obtained by means of the simulator, which includes an additional control system (load scheduler), designed to operate simultaneously both the gas and steam sections as a single plant, during the initial phases of the restoration process. This additional control system can be useful to assist the plant operators, by avoiding untimely trip of generators, as well as by limiting the stress of the components and by speeding the restoration process.
机译:停电后的意大利恢复计划传统上依赖于水力发电厂的黑启动能力来启动热力装置。在过去的十年中,意大利的一些火力发电厂通过用燃气轮机给现有的蒸汽部分加水,以联合循环的方式进行了供电。本文的目的是研究是否以及如何将发电厂燃气段的黑启动能力用于启动蒸汽段。这将提高早期恢复过程的速度和可靠性。为此,已经使用Lego模块化代码构建了一个数字模拟器,它可以使您更深入地了解与黑色启动程序有关的所有问题。本文介绍了通过模拟器获得的结果,该模拟器包括一个附加的控制系统(负荷调度程序),该系统设计为在恢复过程的初始阶段同时作为单个设备同时操作燃气和蒸汽部分。该附加控制系统可通过避免发电机不合时宜的跳闸,限制部件的应力以及加快修复过程来帮助工厂操作人员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号