首页> 外文会议>International in situ and on-site bioremediation symposium >Permanent biopile facility at twentynine palms MCAGCC
【24h】

Permanent biopile facility at twentynine palms MCAGCC

机译:二十九棕榈MCAGCC的永久生物堆设施

获取原文

摘要

Battelle has designed, constructed, and operated a permanent bioremediation facility (biopile) at the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The facility consists of a 46-meter-long by 26-meter-wide by 18-centimeter-thick concrete pad underlain with a 60-mil high-density polyethylene (HDPE) liner. The concrete pad contains 12 troughs that are approximately 17 meters long, 18 centimeters wide, and 28 centimeters deep, which contain the perforated extractionpipe. Prior to operation, a soil nutrient levels. Three rounds of sampling (initial, interim, and final) were conducted on the first 1,900 m~3 (2,500 yd~3) batch of petroleum hydrocarbon-contaminated soil treated at the facility. During treatment of the first batch of soil, Battelle used an On-Line Environmental Monitoring System (OEMS) to monitor oxygen, carbon dioxide, total petroleum hydrocarbon (TPH), and pressure for soil was used to monitor moisture content inside the soil pile and soil pile temperature measurements were obtained. Insights into the design, construction, and operation of permanent biopile facilities have been attained.
机译:Battelle已在加利福尼亚州Twentynine Palms的海军陆战队空中地面作战中心(MCAGCC)设计,建造和运营了永久性生物修复设施(生物堆)。该设施由一个46米长,26米宽,18厘米厚的混凝土垫层以及60密耳的高密度聚乙烯(HDPE)衬里组成。混凝土垫板包含12个槽,这些槽长约17米,宽18厘米,深28厘米,其中装有带孔的抽气管。手术前,应先确定土壤养分水平。在工厂处理的第一批1,900 m〜3(2,500 yd〜3)受石油烃污染的土壤上进行了三轮采样(初始,中期和最终)。在处理第一批土壤时,Battelle使用在线环境监测系统(OEMS)监测氧气,二氧化碳,总石油烃(TPH),并使用土壤压力监测土壤堆中的水分含量和获得了土壤桩温度的测量值。对永久性生物堆设施的设计,建造和运行有了深入的了解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号