首页> 外文会议>Structures congress >The Equivalent Shore Method
【24h】

The Equivalent Shore Method

机译:等效肖氏法

获取原文

摘要

This paper proposes a simple method to calculate the construction loads on slabs of ultistory reinforced concrete buildings. The method adopts some simplifying assumptions pertinent to the Simplified Method (Grundy and Kabaila, 1963). However, the method considers the shore and reshore flexibilities. Others factors taken into account are the construction cycle, concrete age, shore-slab interaction and the effect of concentrat4ed loads on the slabs. The formulation of the method is developed considering equivalent shores acting in between slabs. A practical example is provided for comparison and performance purposes. The method can be easily coded into a pocket programmable calculator and may fit the needs of a structural design office.
机译:本文提出了一种简单的方法来计算超高强度钢筋混凝土建筑楼板的建筑荷载。该方法采用了与简化方法有关的一些简化假设(Grundy和Kabaila,1963年)。但是,该方法考虑了岸上和岸上的灵活性。其他考虑因素包括施工周期,混凝土年龄,岸板相互作用以及集中荷载对板的影响。该方法的公式是考虑到在平板之间作用的等效海岸而开发的。为比较和性能目的提供了一个实际示例。该方法可以轻松地编码到便携式可编程计算器中,并且可以满足结构设计办公室的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号