'Merchant Plant' Capital Cost Trades That Can Reduce the Initial Capital Investment Needed for APFBC Repowering

机译:“商人工厂”资本成本交易,可以减少APFBC换能所需的初始资本投资

获取原文

摘要

Earlier evaluations provided concept evaluation estimates of the performance and cost for repowering two power stations with advanced circulating pressurized fluidized bed combustion combined cycles (APFBC). Each APFBC reowering evaluation used a Foster Wheeler APFBC island supplying a single APFBC-modified Siemens Westinghouse Power Corporation W501F gas turbine, retaining the use of the existing station's steam turbine/generator. The existing units evaluated from these stations were the following: centre dot The Carolina Power & Light Company's L.V. Sutton station. Two APFBC repowering configurations were assessed: repowering 106 MWe reheat Unit 2 with APFBC; and, repowering both Unit 2 as well as the 97 MWe non-reheat Unit 1 with APFBC. centr4e dot The Duke Energy Dan River station: repowering the 150 MWe reheat Unit 3 with APFBC.
机译:较早的评估为使用先进的循环加压流化床燃烧联合循环(APFBC)为两个电站提供动力的性能和成本提供了概念评估评估。每次APFBC换气评估均使用Foster Wheeler APFBC岛,该岛为APFBC修改后的西门子西屋电力公司W501F燃气轮机提供一台,同时保留了现有电站的蒸汽轮机/发电机的使用。从这些站点评估的现有单位如下:中心点卡罗来纳州电力和照明公司的L.V.萨顿站。评估了两种APFBC供电配置:为106 MWe供电并使用APFBC重新加热2号机组;并使用APFBC为2号机组和97 MWe非再加热1号机组供电。 centr4e dot Duke Energy丹河站:用APFBC重新加热150 MWe的3号机组。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号