首页> 外文会议>SPE annual technical conference and exhibition >Foam for Gas mobility control in the snorre field: the FAWAG project
【24h】

Foam for Gas mobility control in the snorre field: the FAWAG project

机译:打nor领域中用于气体流动性控制的泡沫:FAWAG项目

获取原文

摘要

The FAWAG Project (Foam Assisted WAG) is a full-scale demonstration by Saga Petroleum of the use of foam for gas mobility control. The injection of foam started in the Central Fault Block at the Snorre Field in August 1998, after a two-year planning period and many years of active reserch. The first phase of the project, Surfactant-Alternating-Gas (SAG) injection was completed late 1998, and the co-injection phase is expected to be completed by Summer 1999. Approximately 2000 tons of commercial grade surfactant will be injected in the project. The project is partly sponsored by the European Commission's Thermie program. The paper presents the basic concept behind the method, the selection of chemicals, the logistics for handling of the chemicals and the technical modifications needed on the offshore facility to perform the injection, Preliminary results, particularly the response from the injector, is presented for the first phase of the project.
机译:FAWAG项目(泡沫辅助WAG)是Saga Petroleum全面演示使用泡沫来控制气体流动性的演示。经过两年的计划期和多年的积极研究,在1998年8月在Snorre油田的中央断块开始注入泡沫。该项目的第一阶段是表面活性剂交替气体(SAG)注射,于1998年末完成,共注射阶段预计于1999年夏季完成。该项目将注射约2000吨商业级表面活性剂。该项目部分由欧盟委员会的Thermie计划赞助。本文介绍了该方法背后的基本概念,化学药品的选择,处理化学药品的物流以及海上设施进行注入所需的技术改造。项目的第一阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号