首页> 外文会议>SPE annual technical conference and exhibition >A model for sand screen running on marnock: a horizontal, near-HPHT well development
【24h】

A model for sand screen running on marnock: a horizontal, near-HPHT well development

机译:马诺克跑步型砂屏模型:水平,近乎HPHT开发

获取原文

摘要

The marnock field, situated in the Central North Sea, is the first development in the North Sea to combine the challenges of near HPHT conditions (9100 psi and 310 F) with a horizontal sand screen completion. Once completed, the wells have proved to be highly productive with production rates up to 120mmscf/day. However, well completion, and especially installation of sand screens, has proved problematic with two out of the four wells completed with screens off-bottom
机译:位于北海中部的马诺克田是北海的第一个开发,将靠近HPHT条件(9100 psi和310 f)的挑战与水平砂屏完井相结合。一旦完成,井已经证明生产率高达120mmscf /天的生产率高。然而,完井,特别是砂屏的安装,在四个井中完成的两个井中有问题已经证明有问题

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号