首页> 外文会议>TAPPI international environmental conference >BMP Plan Development-Weyerhaeuser, Longview
【24h】

BMP Plan Development-Weyerhaeuser, Longview

机译:BMP计划开发-Weyerhaeuser,Longview

获取原文
获取外文期刊封面目录资料

摘要

This paper addresses the methodology used at the facility to develop the BMP plan nad accomplish the necessary plan elements prior to the anticipated regulatory deadline of APril 15, 1999. An engineering analysis of hte affected process areas was conducted at the site with the assistance of a consulting firm. This analysis also allowed for in depth review of the regulation at the facility. In this paper, the facility's approach to each of the requirements ofj the regulation will be addressed, including choice of monitioring location for influent to the treatment system, turepentine system containment and isolation, and the process developed to evaluate and track liquor loss incidents. particular attention will be paid to items of past or contiuing concern. Examples include examining the economic break point analysis, collecting the initial set of monitoring data, and developing operator ownership. Additonally, best preactices recognized during the BMP plan developemtn will be highlighted.
机译:本文讨论了工厂在制定BMP计划时所使用的方法,并在预期的1999年APril 15法规规定的最后期限之前完成了必要的计划要素。在现场的协助下,对现场受影响的工艺区域进行了工程分析。咨询公司。该分析还允许对设施的法规进行深入审查。在本文中,将讨论该设施针对该法规的每个要求的方法,包括选择流入处理系统的监控位置,松节油系统的隔离和隔离,以及用于评估和跟踪酒类损失事件的过程。将特别关注过去或持续关注的项目。示例包括检查经济断点分析,收集初始的监视数据集以及开发操作员所有权。此外,将重点介绍BMP计划制定过程中公认的最佳做法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号