首页> 外文会议>The Most Valuable Longwall Mining Event of the Year >Shell Moranbah North - Australia's Newest Longwall Installation Post-Impressive Early Results
【24h】

Shell Moranbah North - Australia's Newest Longwall Installation Post-Impressive Early Results

机译:Shell Moranbah North-澳大利亚最新的长壁装置令人印象深刻的早期结果

获取原文
获取外文期刊封面目录资料

摘要

Moranbah North Coal is a recently developed underground, longwall mine. The mine produces high quality coking coal which is sold on the international market. The longwall is the production centre of the mine and the stringent procurement program followed reflected this importance The production requirements necessitate that the longwall extracts over 32 million tonnes of coal whilst fulfilling quality, technical and safety standards. Manufacturing monitoring of the longwall components included 'Fitness for Purpose', Compatibility and a Mini-Build. Final commissioning tests were completed once the longwall was installed. Production from the longwall is expected to increase from 4.2 million tonnes ROM coal in the first year to over 10 million tonnes ROM coal within the next five years. This will not be easily achieved. However, given the coal resource, the current mine infrastructure, the capacity of the installed longwall system and the attitude of all concerned at Moranbah North Coal, this goal is realistic.
机译:Moranbah North Coal是最近开发的地下长壁煤矿。该矿生产高品质的炼焦煤,并销往国际市场。长壁是矿井的生产中心,严格的采购计划也体现了这一重要性。生产要求使长壁开采超过3200万吨的煤炭,同时要满足质量,技术和安全标准。长壁组件的制造监控包括“目标适应性”,兼容性和微型构造。一旦安装了长壁墙,便完成了最终的调试测试。长壁的产量预计将从第一年的420万吨ROM煤炭增加到未来五年内的超过1000万吨的ROM煤炭。这将不容易实现。然而,考虑到煤炭资源,当前的矿山基础设施,已安装的长壁系统的容量以及对Moranbah North Coal的所有相关人员的态度,这一目标是现实的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号