首页> 外文会议>International conference on solid waste technology and management >The cherry island phases IV and V MSW landfill: an innovative municipal solid waste landfill design and construction
【24h】

The cherry island phases IV and V MSW landfill: an innovative municipal solid waste landfill design and construction

机译:樱桃岛四期和五期城市生活垃圾填埋场:创新的城市固体垃圾填埋场设计与建造

获取原文

摘要

This technical paper discusses innovative geotechical design and construction issues related to the landfilling of approximately 100 feet of municipal solid waste (MSW) atop 80 to 100 fett fo very soft, weak, and compressible dredge spoils and underlying native fine-grained foundation soils. The dredge spoils were obtained from dredging bottom sediments from two adjacent intersecting revers, The dredge spoils were retained within an earthen bernm that surrounds the 120-acre site immediately adjacent to the confluence of the rivers. OBvious geotechnical issues related to the compressibility and shear strength/bearing capacity of these materials, as well as the potential for slope instability of the earthen perimenter berm, required detailed evaluation as part of the final design and constructin of the landfill and its lining and leachate collection system. This paper will discuss these issues.
机译:本技术文件讨论了创新的地球技术设计和施工问题,这些问题涉及在非常柔软,稀薄且可压缩的挖泥土和下面的天然细粒基础土壤上填埋约100英尺(80英尺)的城市固体废物(MSW)。疏edge弃土是通过疏two两个相邻的相交反向路段的底部沉积物而获得的。疏edge弃土被保留在一个土层中,该土层围绕着120英亩的河流,紧邻河流汇合处。与这些材料的可压缩性,抗剪强度/承载力以及土坡口机护堤的坡度不稳定性相关的明显岩土工程问题,需要进行详细评估,作为填埋场及其衬砌和渗滤液的最终设计和施工的一部分收集系统。本文将讨论这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号