首页> 外文会议>International conference on computer aided design, manufacture and operation in the railway and other advanced mass transit systems >Communication and control system for fleet maintenance management of the DBAG locomotive BR101
【24h】

Communication and control system for fleet maintenance management of the DBAG locomotive BR101

机译:DBAG机车BR101机队维护管理的通信和控制系统

获取原文

摘要

The concept of the new high performance locomotive BR101 for the DBAG is based on the modular system design of the ECO2000 family. This article describes the design of its communication and control system with respect to the requirements of cost effective and efficient maintenance measurements, which are implemented in order to manage the short delivery times without major teching trouble obstacles and in order to achieve the guaranteed LCC values. The on-boarddiagnostic system is designed in accordance with the experiences of the ICE diagnostic system and the standards defined by UIC leaflet 557; it is supported by a central fleet mangement system connecting each locomotive via GSM. Thereby a big portion of preventive maintenance is no any longer dependend on limited flexibility of fixed installations for error detection and allocation.
机译:用于DBAG的新型高性能机车BR101的概念基于ECO2000系列的模块化系统设计。本文针对具有成本效益和高效维护措施的要求,描述了其通信和控制系统的设计,这些措施的执行目的是为了管理交货时间短而没有主要技术麻烦的障碍,并实现有保证的LCC值。车载诊断系统是根据ICE诊断系统的经验和UIC手册557定义的标准设计的;它由中央机队管理系统支持,该系统通过GSM连接每个机车。因此,大部分预防性维护不再依赖于固定设备在错误检测和分配方面有限的灵活性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号