首页> 外文会议>UNITAR international conference on heavy crude and tar sands >The Pilot Test on Steam Flooding for the Heavy Oil Reservoir of the Qi-40 Fault Block
【24h】

The Pilot Test on Steam Flooding for the Heavy Oil Reservoir of the Qi-40 Fault Block

机译:Qi-40断块稠油油藏蒸汽驱先导试验

获取原文

摘要

Considering the situation of the Qi-40 fault block that the formation pressure was getting lower and lower and the effect of the steam stimulation was getting worse, comprehensive appreciation was conducted for the block. After physical and numerical simulation, we concluded that, compared with any other developing methods, steam flooding might be the best way for the development of the Qi-40 block. A pilot test of steam flooding was held on the Lian2 layer group in the middle of the Qi-40 block in May, 1996, based on the 15-29 and 13-291 well groups. The area of the pilot site was 0.15km~2 with geological reserves of 75X10~4t. Assisted by some compensatory means, the effect seemed to be satisfied. Generally speaking, the 40 block is suitable for steam flooding development and the whole scale steam flooding is industrially applicable.
机译:考虑到Qi-40断块的地层压力越来越低,蒸汽激发效果越来越差的情况,对该块进行了综合评价。经过物理和数值模拟,我们得出的结论是,与任何其他开发方法相比,蒸汽驱可能是Qi-40区块开发的最佳方法。基于15-29和13-291井组,于1996年5月在Qi-40区块中段的Lian2层组进行了蒸汽驱的中试。试点区域面积0.15km〜2,地质储量75X10〜4t。在某种补偿手段的帮助下,效果似乎令人满意。一般而言,40块适合于蒸汽驱开发,整个规模的蒸汽驱在工业上是适用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号