Using a hybrid design/build approach to construct a water treatment plant upgrade case history of the orlando utilities commission conway water treatment plant upgrade

机译:使用混合设计/建立方法来构建水处理厂升级案例历史奥兰多公用事业委员会康威水处理厂升级

获取原文

摘要

As public water utilities face ever increasing challenges to imporve efficiency,alternative project delivery methods are becomign more popular as a method to reduce project costs and schedules.Some owners are concerned that with the design/build (D/B) approach they lose significant control of the development of the design of their capital projects.On the other hand,designer/builders who bid to loosely defined project criteria packages must take risks and deal with owners to manage the form and function of hte project so that the project meets the owner's needs and is profitable to the designer/builder.A hybrid D/B method is the "EPCM" approahc.Wikth the EPCM approach,the owner selects an engineer,procurement and ocnstruction manager (EPCM) on the basis of qualifications.the owner and EPCM negotiate design and ocnstruction management fees and profit on the construction.the owner and EPCM work together to devleop the design and mutually decide when to negotiate a guaranteed maximum price for the project to be built.COnstruction can begin at any time that any portion of the project design is ready and the owner is satisfied with the form,function and price.This paper chronicles the Orlando Utilities Commission Conway Water treatment Plant upgrade which was procured using an EPCM approahc.For OUC,the EPCM approahc has allowed the owner significant involvement in the design development,early construction initiation,and budget control.For the EPCM,risks have been controlled and ocsts have been reduced by cmpressing schedule and having the builder involved in the desifgn.Construction of the Conway WTP project started six months ahead of schedule and the construction cost is well under the budget.
机译:随着公共水公用事业面临强风效率的挑战,替代项目交付方法是减少项目成本和时间表的方法更受欢迎。有些业主与设计/构建(D / B)接近,它们失去了重大控制他们的资本项目设计的发展。另一方面,投标到松散定义的项目标准包的设计师/建筑商必须承担风险并处理所有者来管理HTE项目的形式和功能,以便该项目符合所有者的表格和功能需要并对设计人员/建设者有利可图.Aybridd / b方法是“EPCM”ApproAhc.Wikth ePCM方法,业主根据资格选择工程师,采购和Ocnstruct Manager(EPCM)。所有者和所有者EPCM谈判设计和OCNAcruction管理费用,并在建设中获利。所有者和EPCM一起工作,并协同设计并相互决定何时谈判保证最高价格对于要构建的项目。建筑物可以随时开始,任何项目设计的任何部分都准备就绪,并且业主对表单,功能和价格满意。这篇论文编年史记录奥兰多公用事业委员会康威水处理厂升级已采购使用EPCM ApproAHC.FOR obc,EPCM ApproATHC允许所有者在设计开发,早期建设启动和预算控制方面取得大幅参与。对于EPCM,受到控制的风险,CM按计划和制造商减少了OCSTS参与Desifgn.Conware的WTP项目提前六个月开始,建设成本在预算下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号