首页> 外文会议>American power conference >Potential stranded costs and Accelerated depreciation rates for a high-cost power plant
【24h】

Potential stranded costs and Accelerated depreciation rates for a high-cost power plant

机译:高成本发电厂的潜在滞留成本和加速折旧率

获取原文

摘要

Regulatory reform of the power generating sector is expected to introduce competiton into the electricity markets of the country. Regulated electric utilities are responding by initiating various measures to increase their efficiency. These measures include down-sizing, re-engineering, forming non-regulated subsidiaries and merging with other utilities followed by the other fore-mentioned measures. The objective of all these measures is to reduce the operational costs of the utility to match those of a potential competitor, such as a "lean" independent power producer (IPP).
机译:预计发电部门的监管改革将引入国家电力市场的竞争力。 受监管的电机公司通过启动各种措施来提高其效率来响应。 这些措施包括减少,重新设计,形成非监管的子公司,并与其他公用事业合并,然后与其他前提措施合并。 所有这些措施的目的是降低效用的运营成本,以匹配潜在竞争对手的运营成本,例如“精益”独立的电力生产商(IPP)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号