首页> 外文会议>Americas Conference on Information Systems >Tolerance of Escalating Commitment to Troubled Projects
【24h】

Tolerance of Escalating Commitment to Troubled Projects

机译:易于升级对陷入困境项目的承诺

获取原文

摘要

Escalation of commitment can commonly be characterized by a series of decisions to persist with a project despite minor yet repeated departures from prior expectations. Hampered by low cost visibility and vague progress metrics, software development project teams often tolerate seemingly minor slippages from project plans as inevitable consequences of embarking on large and complex ventures. These studies investigate how project support, escalation and failure are influenced through the limits of a decision-maker's tolerance (termed here 'Zones of Tolerance', or ZOTs) for variations from expected outcomes. ZOTs are the extant boundary conditions within which variations from expectations are recognized but carry no significant utility or disutility to the decision-maker, hence are not adequately corrected. In the first two studies we demonstrate empirically how allowing these seemingly innocuous variations can create the historically antecedent conditions typical of escalation of commitment episodes if they are allowed to cascade and compound over time. Paradoxically, we find that comparatively low budget overruns (which tend to be tolerated) lead greater total resource commitments than high budget overruns (which tend to be corrected). In addition, we find in the first experiment that investment alternatives have no significant effect on the decision to escalate commitment to troubled projects, contrary to prior studies. In the second study we find also that the stability of variances across time has a significant effect on the growth and diminution of ZOTs. The proposed third study investigates the effect of ZOTs in project portfolios over time.
机译:承诺的升级可以通常由一系列决策的特点,尽管从之前预期的轻微但重复偏离一个项目坚持。通过低成本的可见性和模糊进步度量受到阻碍,软件开发项目团队往往容忍项目计划的貌似轻微的滑点,这是踏上大型和复杂的企业的必然后果。这些研究探讨如何项目的支持,升级和故障都通过决策者的容忍限度的影响(这里称为“宽容区”,或ZOTs)从预期结果的变化。 ZOTs是在其内从期望变化被识别,但不携带显著实用程序或负效用到决策者,因此没有充分校正现存的边界条件。在前两个研究中我们展示了经验,允许如何将这些看似无害的变化可以创建典型发作的承诺升级的历史条件前提,如果他们被允许级联和复合随着时间的推移。矛盾的是,我们发现,相对低的预算超支(往往被宽容)比高预算超支(往往被纠正)更大的总资源承诺。此外,我们在第一个实验中发现,投资方案对升级承诺,有问题的项目,违背了先前的研究决定没有显著影响。在第二项研究中,我们还发现,变化的跨时间的稳定性对ZOTs的增长和缩减产生显著的效果。所提出的第三项研究调查ZOTs的项目组合随时间变化的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号