首页> 外文会议>Rapid excavation and tunneling conference >UNPRECEDENTED EPB EXCAVATION IN PRESSURIZED MIXED GROUND CONDITIONS: STUDY OF PERFORMANCE AT THE EMISOR ORIENTE WASTEWATER TUNNEL
【24h】

UNPRECEDENTED EPB EXCAVATION IN PRESSURIZED MIXED GROUND CONDITIONS: STUDY OF PERFORMANCE AT THE EMISOR ORIENTE WASTEWATER TUNNEL

机译:上所未决的EPB挖掘在加压混合地区条件下:Emisor Oriente废水隧道上的性能研究

获取原文

摘要

Mexico City's Emisor Oriente Wastewater Tunnel, a 63 km long mega project, is arguably one of the most challenging TBM tunnels in the world today. High water pressures, watery lake clays, mixed soil and rock, abrasive basalt, and boulders up to 800 mm in diameter combine to make the use of six 8.93 m diameter EPBs on this project not only challenging, but also unprecedented. This paper will analyze the excavation of Emisor Oriente Lots 1B and 3, some of the most difficult bores operating under tight excavation schedules. Startup configurations, advance rates, wear results, geological findings, muck removal using continuous conveyors, and any necessary hyperbaric interventions will also be discussed.
机译:墨西哥城的Emisor Oriente Wastewater Tunnel,63公里长的Mega Project,可以说是世界上最具挑战性的TBM隧道之一。高水压,含水湖粘土,混合土壤和岩石,磨料玄武岩,直径高达800毫米的巨石,在这个项目上使用六个8.93米的EPB,不仅具有挑战性,而且前所未有。本文将分析Emisor Oriente Lots 1B和3的挖掘,一些最困难的挖掘时间表运行。启动配置,提前速率,磨损结果,地质发现,使用连续输送机的淤泥去除,以及任何必要的高压干预措施也将被讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号