首页> 外文会议>Rapid excavation and tunneling conference >A COMPACT DESIGN FOR SHAFT-TUNNEL JUNCTION ADOPTED FOR GREATER CAIRO METRO LINE 3: DESIGN ASPECTS AND USE OF ADVANCED NUMERICAL METHODS
【24h】

A COMPACT DESIGN FOR SHAFT-TUNNEL JUNCTION ADOPTED FOR GREATER CAIRO METRO LINE 3: DESIGN ASPECTS AND USE OF ADVANCED NUMERICAL METHODS

机译:用于更大的开罗地铁3号线采用的轴隧道结的紧凑设计:设计方面和先进数值方法的使用

获取原文

摘要

A new concept was recently introduced for the design of shaft-tunnel junctions on the Greater Cairo metro system, whereby no ground improvement and no crosspassages are necessary. The principle lies in driving the TBM to intercept a circular slurry wall. The shaft can then be excavated in several stages, allowing for the construction of a concrete portal. While this approach entails savings, it requires adequate detailing of re-bars and shear connectors. Advanced 3D numerical modelling is used to assess structural forces for design. This example illustrates how advances in construction methods can be stimulated through improvements in the analytical tools.
机译:最近为更大的开罗地铁系统设计设计了一个新的概念,从而无需接地改善,并且不需要交叉。该原理在于驱动TBM拦截圆形浆料壁。然后可以在几个阶段挖掘轴,允许建造混凝土门户。虽然这种方法需要节省,但它需要充分详细地详细说明RE-BARS和剪切连接器。高级3D数值模型用于评估设计的结构力。该示例说明了如何通过分析工具的改进来刺激施工方法的进步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号