首页> 外文会议>Rapid excavation and tunneling conference >ADECO AS AN ALTERNATIVE TO NATM: HOW IT WORKS, WHY IT WORKS
【24h】

ADECO AS AN ALTERNATIVE TO NATM: HOW IT WORKS, WHY IT WORKS

机译:Adeco作为Natm的替代品:它是如何工作的,为什么它有效

获取原文

摘要

And Rabcewicz said "tunnels should be driven full face whenever possible." ADECO, which stands for "Analysis of Controlled Deformations in tunnels," now allows us to fulfill Rabcewicz's dream in any stress-strain condition. In order to achieve that dream and its consequent control over cost and schedule, however, NATM must be abandoned for the ADECO. The paper presents the basic concepts in the ADECO approach to design, construction and monitoring of tunnels together with some case histories, including: full face excavation for Cassia tunnel (width of 22 m, height of 14 m) in sands and silts under 5 m cover below an archeological area in Rome, Italy; Tartaguille tunnel (face area > 100 m~2) advanced full face in highly swelling and squeezing ground under 100 m cover where NATM led to catastrophic failure, France; and 80 km of tunnels (face area > 100 m~2) advanced full face in highly squeezing/swelling ground under 500 m cover for the high-speed railway line between Bologne and Florence, Italy (turnkey contract).
机译:而Rabcewicz说:“坑道应尽可能推动全脸。” ADECO,代表“隧道控制变形的分析,”现在让我们来满足Rabcewicz在任何应力应变状态梦想。为了实现这一梦想和其对成本和进度控制的结果,然而,新奥法必须放弃对ADECO。本文介绍在ADECO方法来设计,施工的基本概念和一些情况下的历史一起监测隧道,其中包括:在砂下5米全罩式开挖决明隧道(为22μm宽,14米高度)和粉砂盖下方在罗马,意大利的考古区; Tartaguille隧道(面部区域>百米〜2)先进的全脸在高度肿胀和下百米盖其中NATM导致灾难性的故障,法国挤压地层;和80公里隧道(面部区域>百米〜2)先进的全脸在高度压缩/下500米盖肿胀地面波伦亚和意大利佛罗伦萨(交钥匙合同)之间的高速铁路线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号