首页> 外文会议>Rapid excavation and tunneling conference >London Bridge Station, Jubilee Line Extension
【24h】

London Bridge Station, Jubilee Line Extension

机译:伦敦桥站,银禧线扩展

获取原文

摘要

London Underground Limited are currently constructing an extension of the Jubilee Line. The approximately 16-km long Jubilee Line Extension Project connects the existing Green Park Underground Station with the Canary Wharf area and Greenwich. Being a part of the project, the London Bridge Station (Contract 104) was built using a combination of the New Austrian Tunneling Method (NATM) with Compensation Grouting. NATM was success-fully applied in softground and urban areas under restrictive requirements regarding settlement limitation. Information on the flexibility of the method and the influence of Compensation Grouting on ground and tunnels are given.
机译:伦敦地铁有限公司目前正在建设银禧线的扩建部分。长达约16公里的银禧线扩展项目将现有的Green Park地铁站与Canary Wharf地区和Greenwich连接起来。作为该项目的一部分,伦敦桥车站(104号合同)是结合新奥地利隧道方法(NATM)和补偿灌浆建造的。 NATM在沉降限制方面的严格要求下已成功应用于软土地和城市地区。给出了该方法的灵活性以及补偿灌浆对地面和隧道的影响的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号