Gainesville Regional Utilities (GRU), Deerhaven Unit 2 is located in Gainesville, Florida. The unit has a capacity of 235 MW. The Riley dry bottom turbo is rated at 1,788,000 lbs/hr S.H. steam flow. Burns & McDonnell (B&McD) was retained by GRU to develop and implement a NO_x reduction program for Deerhaven Unit 2. The program started in January 1995.
展开▼
机译:盖恩斯维尔地区公用事业公司(Deerhaven Unit 2)位于佛罗里达州盖恩斯维尔。该装置的容量为235兆瓦。莱利干底涡轮的额定S.H为1,788,000磅/小时。蒸汽流量。 GRU保留了Burns&McDonnell(B&McD)来开发和实施Deerhaven 2号机组的NO_x减排计划。该计划于1995年1月开始。
展开▼