General layout of Shisangling Pumped Storage Power Station and relative technical problems

机译:十桑岭抽水蓄能电站总体布置及相关技术问题

获取原文

摘要

Shisanling Pumped Storage Power Station is located at Shisanling Scenic Spot, on the north of Beijing, 40 km from center of the city. The existing Shisanling Reservoir is taken as lower reservoir, and the upper reservoir is built on the Shangsi gully behind Mang mountain ridge, on the left bank of the lower reservoir. The max. static head and horizontal length of water way system of the Station are 481 m and about 2300 m respectively. The underground powerhouse and water way system are built inside Mang mountain. Four Francis reversible pump-turbines with 200 MW each are installed in the power house. The power station began to be constructed in 1992, and generated power with first unit at the end of 1995. The power station is connected to Beijing-Tianjin-Tangshan Power Grid with Double-circuit line of 220 kV to carry out the tasks of modulating peakload and emergency reserve in the Grid. After all the units of the power station are put into operation, the capacity for peaking hydropower and the installed capacity of pumped storage power stations in the Grid will come up to 8.3% of total installed capacity, so that the dispatching ability of the Grid will be more flexible, ensuring the Grid operation safe, stable and economic.
机译:十三陵抽水蓄能电站位于北京北部的十三陵风景区,距市中心40公里。现有三狮岭水库作为下层水库,上层水库建在下层水库左岸Man山岭后的上四沟。最高该站水路系统的静压头和水平长度分别为481 m和约2300 m。 Man山内建有地下厂房和水路系统。动力室内安装了四台每台200兆瓦的弗朗西斯可逆式水泵水轮机。该电站始建于1992年,并于1995年底通过第一台机组发电。该电站与220 kV双回路线路的京津唐电网并网,以完成调制任务。电网中的峰值负载和紧急备用。电站所有机组投入运行后,电网水电调峰容量和抽水蓄能电站的装机容量将达到总装机容量的8.3%,从而电网的调度能力将达到更加灵活,确保电网运行安全,稳定,经济。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号