PRINCIPLES IN PLANT MANAGEMENT: LESSONS LEARNED THROUGH COAL PULVERIZER ANALYSIS - ST. CLAIR POWER PLANT - DETROIT EDISON

机译:工厂管理的原则:通过煤粉粉碎机分析中学到的经验教训-ST。 CLAIR发电厂-底特律爱迪生

获取原文

摘要

In recent years, St. Clair Power Plant had been experiencing an unacceptably high rate of shaft failures on their EL-70 pulverizers. A comprehensive root cause problem analysis identified the failure mechanism to be high cycle bending fatigue in a fretting corrosion environment due to the interplay of three major factors:(1) Utilization of defective replacement parts(2) Failure to maintain proper internal clearances and component alignment during pulverizer overhauls(3) Inadequate potential problem analysis and training when pulverizer modifications were made.Conclusions drawn were that:(1) Buying on price alone, without adequate parts specification and quality assurance, was no bargain.(2) Failure to perform quality work during pulverizer overhauls ultimately resulted in poor reliability, lost generation and costly re-work.(3) When modifying equipment, effective potential problem analysis was not performed. As a result the operators did not receive training in necessary preventive and/or contingency actions. This, in turn, led to pulverizer failures which otherwise should have been avoided.
机译:近年来,圣克莱尔发电厂的EL-70粉碎机的轴故障率极高,令人无法接受。全面的根本原因问题分析确定了故障机理是在微动腐蚀环境中的高循环弯曲疲劳,这归因于以下三个主要因素的相互作用: (1)使用有缺陷的替换零件 (2)粉碎机大修期间未能保持适当的内部间隙和组件对齐 (3)修改粉碎机后,潜在的问题分析和培训不足。 得出的结论是: (1)仅凭价格购买,没有足够的零件规格和质量保证,绝对不算便宜。 (2)粉碎机大修期间未能执行优质工作,最终导致可靠性差,发电量减少和返工成本高昂。 (3)改装设备时,未进行有效的潜在问题分析。结果,操作员没有接受必要的预防和/或应急措施方面的培训。反过来,这导致了粉碎机故障,否则应避免。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号