DESIGN OF MODULATION CONTROLLER TO DAMP POWER OSCILLATIONS OF PARALLEL AC LINE IN THE TIANSHEBQIAO TO GUANGDONG HVDC TRANSMISSION

机译:天石桥至广东高压直流输电线路交流线路阻尼振荡的调制控制器设计。

获取原文

摘要

Tianshenqiao Hydro Station is located at Guangxi Province. Its ultimate installed capacity is 2520mw (6×220mw+4× 300mw). Tianehenqiao to Guangdong HVDC transmission llne is the second DC line in China, it will operate in 1996. The DC line is about 960km, transferee 1800 mw power to Guangdong through the DC line. By the end of 1996, there are one 500kv AC line and one ±500kv DC line interconection between Guangxi and Guangdong system.By appropriate modulation of power order on HVDC transmission system the transient stability performance of the integrated AC/DC power system can be improved greatly, as shown by considerable amount of theoretical work already published in this area. The 1800mw Tiansheqiao to Guangdong HVDC transmission will be provided with the HVDC power modulation feature intended to stabilize the AC power system.In a transmission system which has both AC and DO line running in parallel thepower order to the HVDC can be modulated in order to reduce the power swings in the AC line and thus increase the stability limit of the integrated AC/DC system. The power modulation for Tianshenqiao to Guangdong HVDG transmission was carried out by BPA prorram which was developed by Bonneville PowerAdministration in U.S.A.. Comprehensivedigital computer studies show the importance of the power modulation for the Tianshenqiao to Guangdong HVDC transmiation.This paper describes the results of thestudy carried out to design the powermodulator for the Tianshenqiao to Guangdong HVDC transmission system. It shows how the transient stability limit can be increased by power modulation on BVDC.
机译:天神桥水电站位于广西省。其最终装机容量为2520mw(6×220mw + 4×300mw)。天河桥至广东高压直流输电线路是中国第二条直流线路,将于1996年投入运行。该直流线路约960公里,通过直流线路将1800兆瓦的电力转移至广东。到1996年底,广西电网之间有1条500kv AC线路和1条±500kv DC线路对接,通过适当调节HVDC输电系统的功率顺序,可以改善AC / DC集成电力系统的暂态稳定性能正如该领域已经发表的大量理论工作所表明的那样。 1800mw的天蛇桥至广东HVDC输电将具有HVDC功率调制功能,旨在稳定交流电系统。在同时具有AC和DO线并行运行的输电系统中,可以对HVDC的功率阶数进行调制,以降低电源在AC线路中摆动,因此增加了集成AC / DC系统的稳定性极限。由美国邦纳维尔电力局开发的BPA prorram进行了天神桥至广东HVDG输电的功率调制,全面的数字计算机研究表明,功率调制对于天神桥至广东HVDC输电的重要性。为天神桥至广东高压直流输电系统设计功率调制器。它显示了如何通过BVDC上的功率调制来提高瞬态稳定性极限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号