首页> 外文会议>Conference of the Australian Society of Sugar Cane Technologists >BAGASSE TRANSPORT AND STORAGE FOR THE PIONEER COGENERATION PROJECT
【24h】

BAGASSE TRANSPORT AND STORAGE FOR THE PIONEER COGENERATION PROJECT

机译:Pioneer热电联产项目的Bagasse运输和存储

获取原文

摘要

THE PIONEER COGENERATION plant commissioned in 2005 provided the driver for a radical change to the traditional bagasse handling operations at Pioneer Mill. The reliable supply of good clean fuel for generation suddenly became paramount and a range ofnew processes and equipment types were evaluated and then implemented. The project involved the transport of bagasse from the surrounding mills and the storage and reclaiming operations necessary to meet the new project's demands. More than 130 000 t ofbagasse (fuel) are now handled each year at Pioneer Mill with the bulk burnt in the new boiler which provides steam to the condensing turbine. This paper outlines the new processes that have been developed to meet the fuel handling needs of the Pioneercogeneration project since the plant came on line in the crushing season of 2005.
机译:2005年委托的先锋热电联产工厂为先锋轧机的传统巴斯斯处理运营提供了激进的改变。用于发电的可靠性供应良好的良好燃料突然变得至高无上,评估了新的进程和设备类型,然后实施。该项目涉及从周边厂房运输Bagasse,并储存,并回收业务,以满足新项目的需求。每年在先锋磨坊中每年处理超过130 000吨(燃料),并在新锅炉中散装烧焦,为冷凝式涡轮机提供蒸汽。本文概述了为满足植物植物组织项目的燃料处理需求而开发的新进程,自2005年的破碎季节以来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号